Contents
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Common elements of the well integrity life cycle
5.1 General
5.2 Well integrity
5.3 Well integrity policy
5.4 Well integrity management system
5.5 Risk assessment
5.5.1 General
5.5.2 Risk register
5.5.3 Well type risk profile
5.6 Organizational structure and tasks
5.7 Barriers
5.7.1 Barrier philosophy
5.7.2 Operational barriers
5.7.3 Human barriers
5.7.4 Administrative controls
5.7.5 Impact barriers
5.7.6 Performance standards for equipment
5.8 Well operating limits
5.8.1 General
5.8.2 Well barrier verification
5.9 Function testing
5.9.1 General
5.9.2 Barrier verification testing
5.9.3 Direction of flow
5.9.4 Effects of temperature
5.9.5 Modelling verification
5.9.6 Reporting and documentation
5.10 Well integrity status reporting
5.10.1 General
5.10.2 Well life cycle phase deliverables
5.10.3 Well handover process
5.10.4 Management of change
5.11 Dispensation from the WIMS
5.11.1 General
5.11.2 MOC process
5.11.3 Continuous improvement
5.12 Key performance indicator monitoring
5.12.1 General
5.12.2 Lessons learned
5.12.3 Auditing
5.13 Audit process
5.13.1 General
5.13.2 Basis of design phase
6 Basis of design phase
6.1 Basis of design phase objectives
6.2 Organizational structure and tasks
6.3 Well barriers
6.4 Hazard identification and assessment
6.5 Well integrity considerations for the basis of design
6.5.1 General information to be provided
6.5.2 Well objectives and life cycle
6.5.3 Inflow requirements
6.5.4 Outflow requirements
6.5.5 Well location and targets
6.5.6 Prognoses regarding geological formations, pore pressure, formation strength and temperature
6.5.7 Data acquisition requirements
6.5.8 Other considerations for well integrity
6.5.9 Production and injection characteristics affecting well integrity through the life cycle
6.6 Quality assurance and approval process
6.7 Deliverables
7 Well design phase
7.1 Well design phase objectives
7.2 Organizational structure and tasks
7.3 Risk controls in well design
7.3.1 Risk register
7.3.2 Lessons learned
7.3.3 Well life cycle risk considerations
7.3.4 Additional considerations during well design
7.4 Well barriers
7.4.1 General
7.4.2 Well barrier plan
7.4.3 WBE design performance standards
7.4.4 Verification of the final well barrier
7.4.5 Emergency shutdown related safety systems
7.5 Well operating limits
7.6 Contingency planning for well construction
7.7 Surveillance and monitoring requirements
7.8 Well design deliverables, reporting and documentation
8 Well construction phase
8.1 Well construction phase objectives
8.2 Organizational structure and tasks
8.3 Well programme
8.4 Well barrier schematic
8.5 Barrier verification
8.5.1 General
8.5.2 Wellhead movement and fatigue
8.5.3 Cement
8.5.4 Casing shoe testing
8.5.5 Wellhead seal profile
8.5.6 Tubular connections
8.5.7 Casing wear
8.6 Risk identification and assessment
8.7 Management of change
8.7.1 Potential changes to the well plan
8.7.2 Suspended well considerations
8.8 Deliverables (reporting and documentation)
8.8.1 Well handover information
8.8.2 Risk register
8.9 Continuous improvement
9 Well operational phase
9.1 Well operational phase objectives
9.2 Organizational structure and tasks
9.3 Well barriers
9.3.1 General
9.3.2 Performance standards
9.3.3 Monitoring and surveillance frequency
9.4 Well operating limits
9.4.1 General
9.4.2 Suspended and shut-in wells
9.4.3 Visual inspection
9.4.4 Well logging
9.4.5 Corrosion monitoring
9.4.6 Corrosion monitoring and prevention - external
9.4.7 Erosion monitoring
9.4.8 Structural integrity monitoring
9.4.9 Well elevation monitoring
9.4.10 Reservoir subsidence
9.4.11 Management considerations
9.4.12 Sources of annulus pressure
9.5 Annulus pressure management
9.5.1 General
9.5.2 Annulus pressure monitoring and testing
9.5.3 Frequency of monitoring tubing and annulus casing pressures
9.5.4 Investigation of annulus pressure
9.5.5 Maximum allowable annulus surface pressure
9.5.6 Maintaining annulus pressure within the thresholds
9.5.7 Review and change of MAASP and thresholds
9.5.8 Well maintenance
9.6 General
9.6.1 Replacement parts
9.6.2 Frequency of maintenance
9.6.3 Component testing methods
9.6.4 Risk assessment of well integrity failure and its management
9.7 General
9.7.1 Integrity failure ranking and prioritization
9.7.2 Well failure model
9.7.3 Well monitoring and surveillance
9.8 Reporting and documentation
9.9 Periodic well review
9.9.1 Well use review
9.9.2 End of well life review
9.10 Change of well use
9.11 Well stock performance review
9.12 Continuous improvement
10 Well intervention phase
10.1 Well intervention phase objectives
10.2 Organizational structure and tasks
10.3 Well handover
10.4 Well intervention programme
10.5 Well barriers
10.5.1 General
10.5.2 Well barrier plans
10.5.3 Well barrier qualification
10.5.4 Well barrier verification
10.5.5 Well operating limits
10.6 Risk management
10.7 Management of change
10.8 Deliverables (documentation and reports)
11 Well abandonment phase
11.1 Well abandonment phase objectives
11.2 Organizational structure and tasks
11.3 Well abandonment programme
11.4 Well barriers for abandonment
11.4.1 General
11.4.2 Well barrier material selection and qualification
11.4.3 Well barrier placement, configuration and redundancy
11.4.4 Well barrier verification
11.4.5 Reference documents for well abandonment barriers
11.5 Risk management
11.6 Management of change
11.7 Deliverables (documentation and reports)
Annex A (informative) Risk assessment techniques
Annex B (informative) Risk register
Annex C (informative) Example of well integrity roles and responsibilities chart
Annex D (informative) Example of a well integrity competence matrix
Annex E (informative) Examples of well barrier elements, functions and failure characteristics
Annex F (informative) Examples of well barriers during the well life cycle and a well barrier schematic
Annex G (informative) Example of performance standard for well barrier elements
Annex H (informative) Function testing by analysing hydraulic signature
Annex I (informative) Determination of leak rate
Annex J (informative) Well handover
Annex K (informative) Examples of key performance indicators
Annex L (informative) Example of hazard identification checklist
Annex M (informative) Example plot of pore pressure versus formation strength
Annex N (informative) Well barrier element performance requirements
Annex O (informative) Example of leak testing of gas-lift valves
Annex P (informative) Example of well operating limits
Annex Q (informative) Example of possible well leak paths
Annex R (informative) MAASP calculations
Annex S (informative) Example of a change in MAASP calculations
Bibliography