European foreword
1 Scope
2 Normative references
3 Terms and definitions
4 General
4.1 Technical principles
4.2 Safeguarding design decisions
4.3 Short sections of trench
5 Construction components and materials
5.1 General
5.2 Materials used for embedment
5.2.1 General
5.2.2 Native soil
5.2.3 Imported materials
5.2.3.1 General
5.2.3.2 Granular materials
5.2.3.3 Bonded materials
5.2.3.4 Other materials
5.3 Materials used for main backfill
6 Construction of trench
6.1 General
6.1.1 Introduction
6.1.2 Working space and soil compaction
6.1.3 Transmission of load between trench support system and soil
6.1.4 Installing and removing the trench support system
6.2 Trenches
6.3 Trench width
6.3.1 Maximum trench width
6.3.2 Minimum trench width
6.3.3 Determination of trench width
6.4 Trench stability
6.5 Trench bottom
6.6 Dewatering
7 General principles of embedment and support
7.1 General
7.2 Bedding construction types
7.2.1 Bedding construction type 1
7.2.2 Bedding construction type 2
7.2.3 Bedding construction type 3
7.3 Special methods of bedding or support
8 Installation
8.1 General
8.2 Setting out
8.3 Delivery, handling and transportation on site
8.4 Storage
8.5 Lifting of components
8.6 Laying
8.6.1 General
8.6.2 Line and level
8.6.3 Jointing
8.6.4 Socket holes
8.6.5 Pipe cutting
8.6.6 Provisions for future connections
8.6.7 Other instructions
8.7 Special forms of constructions
8.7.1 Pipelines above ground
8.7.2 Pipelines within protective pipes
8.7.3 Brick and in situ concrete sewers
8.7.4 Pipelines through, under or close to structures
8.8 Supporting and anchoring
8.9 Manholes and inspection chambers
9 Connection to pipes and manholes
9.1 General
9.2 Connection by junctions
9.3 Connection by connecting fittings
9.4 Connection by saddle fittings
9.5 Connection by welding
9.6 Connection to manholes and inspection chambers
10 Testing during construction
11 Backfilling
11.1 General
11.2 Compaction
11.3 Embedment and initial backfill
11.4 Main backfill
11.5 Removal of trench support system
11.6 Surface reinstatement
12 Final inspection and/or testing of pipelines and manholes after backfilling
12.1 General
12.2 Visual inspection
12.3 Leaktightness
12.4 Embedment and main backfill
12.4.1 General
12.4.2 Compaction
12.4.3 Pipe deformation
13 Procedures and requirements for testing gravity pipelines
13.1 General
13.2 Testing with air (method "L")
13.3 Testing with water (method "W")
13.3.1 Test pressure
13.3.2 Conditioning time
13.3.3 Test requirements
13.3.4 Testing time
13.4 Testing individual joints
14 Testing of pressure pipelines
15 Qualifications
Annex A (informative) Dewatering
A.1 General
A.2 Sump pumping from trench bottom
A.3 Deep wells
A.4 Vertical well points
A.5 Horizontal pipe dewatering
A.6 Eductor well pointing
Annex B (informative) Abstract from DIRECTIVE 2014/25/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February 2014 on procurement by entities operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (Text with EEA relevance)
Annex C (informative) Manufacturer's Instructions
Annex D (informative) Additional national public documents
D.1 France
D.2 Germany
D.3 The Netherlands
D.4 Austria
D.5 Switzerland:
D.6 Sweden
D.7 UK
Bibliography